"Before the panel was finalized |
Coupe Automation Cleanup |
![](images/Panel%20Top%20Before%20Trimout1.jpg) |
Cables provided were just loose and ready to be trimmed out.
This is the top of the 36" panel. |
|
Cables now neatly go into the panel and punch down into the
connection hardware. |
![](images/Panel%20Bottom%20Before%20Trimout1.jpg) |
Cables provided were just loose and ready to be trimmed out.
This is the bottom of the 36" panel. |
![](images/Panel%20Bottom%20Ready%20for%20Cable%20Co1.jpg) |
Cables now neatly go into the panel and punch down into the
connection hardware. The RG-6 video cables are ready for the cable or
satellite guys. I'll try to update AFTER they get done... |
![](images/Panel%20Cable%20Co%20Install%20Top.jpg) |
Here's what the Cable Company guys did. Not bad, not
excellent. |
![](images/Panel%20Cleanup%20After%20Cable%20Co%20Top.jpg) |
With a little rearrangement we added an 8 port Gigabit
Ethernet switch and cleaned up all the cables. |
![](images/Panel%20Cable%20Co%20Install.jpg) |
Cable guys don't like to tie down their splitters. Why? I
don't have a clue. |
![](images/Panel%20Cleanup%20After%20Cable%20Co.jpg) |
Here we've tied down the splitters and cable tied the
cables. Why not? |
|
|
![](images/Panel%20Covered1.jpg) |
Buttoned up and ready for action! |